Crawfish River is a 75 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
Crawfish River is reported in Wisconsin since 2023 under Alliant Energy. Available operating and financial measures include 19.9% capacity factor and 131 GWh annual generation; $1603/kW reported CapEx.
- Location
- Jefferson, Wisconsin
- Technology
- Solar Photovoltaic
- Owner / parent
- Alliant Energy
- Operator
- Wisconsin Power & Light Co
- Grid
- MISO (Midcontinent)
- Plant ID
- 65012
What stands out
Crawfish River is a 75 MW Solar Photovoltaic asset in Wisconsin with status Operating.
Latest annual operating measures report 19.9% capacity factor and 131 GWh annual generation.
Available financial measures include $6.4/MWh OpEx, $1603/kW CapEx.
Latest linked story: “Alliant Energy utility wants to demonstrate nation’s first CO2-based long-duration ‘energy dome’” (Utility Dive, 2024-08-20).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #22 of 132
- National rank
- #1042 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.