111 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-06
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Coyote Ridge BESS is a 111 MW Battery project in Texas, currently active.

Grenergy USA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-06.

Queue ID
ERCOT-27INR0432
Location
Brown, Texas
Technology
Battery
Developer
Grenergy USA
Market / region
ERCOT
Point of interconnection
292 Holder 138 kV

What stands out

1

Coyote Ridge BESS is a 111 MW Battery project in Texas with status active.

2

Grenergy USA is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-06.

Market and operating context

Queue date
2025-01-28
Proposed COD
2027-10-06
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Coyote Ridge BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0432
LocationBrown, Texas
TechnologyBattery
DeveloperGrenergy USA
Market / regionERCOT
Point of interconnection292 Holder 138 kV
Queue date2025-01-28