157 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2030-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Coyote Den Storage is a 157 MW Battery project in Texas, currently active.

Coyote Den Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-30.

Queue ID
ERCOT-27INR0151
Location
Karnes, Texas
Technology
Battery
Developer
Coyote Den Energy Center, LLC
Market / region
ERCOT
Point of interconnection
The Kenedy Switching Station #2 (#8186) to Rosata POD (#8153) Line ; AEP

What stands out

1

Coyote Den Storage is a 157 MW Battery project in Texas with status active.

2

Coyote Den Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-09-30.

Market and operating context

Queue date
2024-02-07
Proposed COD
2030-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Coyote Den Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0151
LocationKarnes, Texas
TechnologyBattery
DeveloperCoyote Den Energy Center, LLC
Market / regionERCOT
Point of interconnectionThe Kenedy Switching Station #2 (#8186) to Rosata POD (#8153) Line ; AEP
Queue date2024-02-07