Briefing/projectactive
Coyote Den Storage is a 157 MW Battery project in Texas, currently active.
Coyote Den Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-30.
- Queue ID
- ERCOT-27INR0151
- Location
- Karnes, Texas
- Technology
- Battery
- Developer
- Coyote Den Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- The Kenedy Switching Station #2 (#8186) to Rosata POD (#8153) Line ; AEP
What stands out
1
Coyote Den Storage is a 157 MW Battery project in Texas with status active.
2
Coyote Den Energy Center, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2030-09-30.
Market and operating context
- Queue date
- 2024-02-07
- Proposed COD
- 2030-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.