Query
Coventry Solar Site 2
Type
Entity Briefing
Entity
Coventry Solar Site 2
Generated
2026-10-10T09:37:14.099Z

Briefing on Coventry Solar Site 2

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
5 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Coventry Solar Site 2 is a 5 MW Solar Photovoltaic asset in NYISO (New York), currently Operating.

Coventry Solar Site 2 is reported in New York since 2024 under NSF Coventry Site 2, LLC. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2584/kW reported CapEx.

Location
Broome, New York
Technology
Solar Photovoltaic
Owner / parent
NSF Coventry Site 2, LLC
Operator
NSF Coventry Site 2, LLC
Grid
NYISO (New York)
Plant ID
68162

What stands out

1

Coventry Solar Site 2 is a 5 MW Solar Photovoltaic asset in New York with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $2584/kW CapEx.

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#277 of 778
National rank
#3265 of 7,971

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.