Covanta Lake County Energy is a 16 MW Municipal Solid Waste asset in Florida, currently Operating.
Covanta Lake County Energy is reported in Florida since 1990 under EQT. Available operating and financial measures include 64.2% capacity factor and 87 GWh annual generation; $3495/kW reported CapEx.
- Location
- Lake, Florida
- Technology
- Municipal Solid Waste
- Owner / parent
- EQT
- Operator
- Covanta Lake Inc
- Grid
- Progress Energy Florida
- Plant ID
- 50629
What stands out
Covanta Lake County Energy is a 16 MW Municipal Solid Waste asset in Florida with status Operating.
Latest annual operating measures report 64.2% capacity factor and 87 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Latest linked story: “Doosan Škoda Power to supply steam turbine to waste-to-energy plant” (Power Engineering, 2024-02-26).
Market and operating context
- Balancing authority
- Progress Energy Florida
- NERC region
- SERC
- State rank
- #9 of 9
- National rank
- #44 of 55
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.