Query
Covanta Lake County Energy
Type
Entity Briefing
Entity
Covanta Lake County Energy
Generated
2026-10-19T23:45:52.669Z

Briefing on Covanta Lake County Energy

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
16 MW
Capacity
Operating
Current status
1990
Operating since
1
Generators
64.2%
Capacity factor
87 GWh
Annual generation
Briefing/plantOperating

Covanta Lake County Energy is a 16 MW Municipal Solid Waste asset in Florida, currently Operating.

Covanta Lake County Energy is reported in Florida since 1990 under EQT. Available operating and financial measures include 64.2% capacity factor and 87 GWh annual generation; $3495/kW reported CapEx.

Location
Lake, Florida
Technology
Municipal Solid Waste
Owner / parent
EQT
Operator
Covanta Lake Inc
Grid
Progress Energy Florida
Plant ID
50629

What stands out

1

Covanta Lake County Energy is a 16 MW Municipal Solid Waste asset in Florida with status Operating.

2

Latest annual operating measures report 64.2% capacity factor and 87 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

4

Latest linked story: “Doosan Škoda Power to supply steam turbine to waste-to-energy plant” (Power Engineering, 2024-02-26).

Market and operating context

Balancing authority
Progress Energy Florida
NERC region
SERC
State rank
#9 of 9
National rank
#44 of 55

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.