Query
Cottage Grove Project CSG
Type
Entity Briefing
Entity
Cottage Grove Project CSG
Generated
2026-10-18T02:31:02.082Z

Briefing on Cottage Grove Project CSG

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
5 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
16.1%
Capacity factor
7 GWh
Annual generation
Briefing/plantOperating

Cottage Grove Project CSG is a 5 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Cottage Grove Project CSG is reported in Minnesota since 2018 under Madison Energy Investments LLC. Available operating and financial measures include 16.1% capacity factor and 7 GWh annual generation; $26.4/MWh reported energy value.

Location
Washington, Minnesota
Technology
Solar Photovoltaic
Owner / parent
Madison Energy Investments LLC
Operator
Madison Energy Investments LLC
Grid
MISO (Midcontinent)
Plant ID
61983

What stands out

1

Cottage Grove Project CSG is a 5 MW Solar Photovoltaic asset in Minnesota with status Operating.

2

Latest annual operating measures report 16.1% capacity factor and 7 GWh annual generation.

3

Available financial measures include $26.4/MWh energy value.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#93 of 549
National rank
#3671 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.