Briefing on CORNUCOPIA HYBRID

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
605 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2030-11-16
Proposed COD
C14
Queue phase
Briefing/projectactive

CORNUCOPIA HYBRID is a 605 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2030-11-16.

Queue ID
CAISO-1959
Location
Fresno, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Gates-Templeton 230 kV Line

What stands out

1

CORNUCOPIA HYBRID is a 605 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2030-11-16.

3

Latest linked story: “California Fast-Tracks Fresno Solar-Battery Project with Regulatory-Easing Measure” (ENR, 2025-03-28).

Market and operating context

Queue date
2021-04-15
Proposed COD
2030-11-16
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

CORNUCOPIA HYBRID — verified asset snapshot

FieldValue
Queue IDCAISO-1959
LocationFresno, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionGates-Templeton 230 kV Line
Queue date2021-04-15
Proposed COD2030-11-16
IA statusIA Executed