Copper Mountain Solar 2 is a 154 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Copper Mountain Solar 2 is reported in Nevada since 2012 under RWE Clean Energy. Available operating and financial measures include 26.3% capacity factor and 356 GWh annual generation; $10.0/MWh reported energy value.
- Location
- Clark, Nevada
- Technology
- Solar Photovoltaic
- Owner / parent
- RWE Clean Energy
- Operator
- RWE Clean Energy
- Grid
- CAISO (California)
- Plant ID
- 58017
What stands out
Copper Mountain Solar 2 is a 154 MW Solar Photovoltaic asset in Nevada with status Operating.
Latest annual operating measures report 26.3% capacity factor and 356 GWh annual generation.
Available financial measures include $10.0/MWh energy value.
Latest linked story: “Five things you should know about Copper Mountain Solar before President Obama's visit” (Las Vegas Sun, 2012-03-20).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #18 of 62
- National rank
- #529 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.