Briefing/projectactive
CONAWAY HYBRID POWER PLANT is a 170 MW Solar+Battery project in California, currently active.
The reported queue phase is C13. Proposed COD is 2023-01-01.
- Queue ID
- CAISO-1687
- Location
- Yolo, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Woodland-Davis 115 kV Line
What stands out
1
CONAWAY HYBRID POWER PLANT is a 170 MW Solar+Battery project in California with status active.
2
The reported queue phase is C13; proposed COD is 2023-01-01.
Market and operating context
- Queue date
- 2020-04-15
- Proposed COD
- 2023-01-01
- IA status
- System Impact Study
- Study phase
- C13
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.