Commodus 2 Wind
Type
Entity Briefing
Entity
Commodus 2 Wind
Technology
wind
Generated
2026-10-19T23:08:23.519Z

Briefing on Commodus 2 Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
641 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2029-07-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Commodus 2 Wind is a 641 MW Wind project in Texas, currently active.

IP Blackwell II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-30.

Queue ID
ERCOT-29INR0033
Location
Swisher, Texas
Technology
Wind
Developer
IP Blackwell II, LLC
Market / region
ERCOT
Point of interconnection
Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)

What stands out

1

Commodus 2 Wind is a 641 MW Wind project in Texas with status active.

2

IP Blackwell II, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-30.

Market and operating context

Queue date
2025-03-03
Proposed COD
2029-07-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Commodus 2 Wind — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0033
LocationSwisher, Texas
TechnologyWind
DeveloperIP Blackwell II, LLC
Market / regionERCOT
Point of interconnectionTapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)
Queue date2025-03-03
Proposed COD2029-07-30