Columbia County 1 is a 60 MW Solar project in New York, currently active.
Hecate Energy Columbia County 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-02-01.
- Queue ID
- NYISO-644
- Location
- Columbia, New York
- Technology
- Solar
- Developer
- Hecate Energy Columbia County 1, LLC
- Market / region
- NYISO
- Point of interconnection
- Craryville 115kV
What stands out
Columbia County 1 is a 60 MW Solar project in New York with status active.
Hecate Energy Columbia County 1, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-02-01.
Latest linked story: “Copake residents continue to fight the Shepherd’s Run solar project” (WRGB, 2026-01-28).
Market and operating context
- Queue date
- 2017-07-26
- Proposed COD
- 2027-02-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.