Briefing on Columbia County 1

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
60 MW
Proposed capacity
active
Current status
Solar
Technology
NYISO
Market / region
2027-02-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Columbia County 1 is a 60 MW Solar project in New York, currently active.

Hecate Energy Columbia County 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-02-01.

Queue ID
NYISO-644
Location
Columbia, New York
Technology
Solar
Developer
Hecate Energy Columbia County 1, LLC
Market / region
NYISO
Point of interconnection
Craryville 115kV

What stands out

1

Columbia County 1 is a 60 MW Solar project in New York with status active.

2

Hecate Energy Columbia County 1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-02-01.

4

Latest linked story: “Copake residents continue to fight the Shepherd’s Run solar project” (WRGB, 2026-01-28).

Market and operating context

Queue date
2017-07-26
Proposed COD
2027-02-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Columbia County 1 — verified asset snapshot

FieldValue
Queue IDNYISO-644
LocationColumbia, New York
TechnologySolar
DeveloperHecate Energy Columbia County 1, LLC
Market / regionNYISO
Point of interconnectionCraryville 115kV
Queue date2017-07-26
Proposed COD2027-02-01