Briefing/plantPlanned
Colonel Charles D. Maynard Project is a 26 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Planned.
Colonel Charles D. Maynard Project is reported in Arkansas under Maynard Hydroelectric LLC. The briefing retains the exact identity and market fields available in the current asset record.
- Location
- Jefferson, Arkansas
- Technology
- Conventional Hydroelectric
- Owner / parent
- Maynard Hydroelectric LLC
- Operator
- Maynard Hydroelectric LLC
- Grid
- MISO (Midcontinent)
- Plant ID
- 69695
What stands out
1
Colonel Charles D. Maynard Project is a 26 MW Conventional Hydroelectric asset in Arkansas with status Planned.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- State rank
- #14 of 20
- National rank
- #436 of 1,462
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.