Briefing on Cold Creek Storage 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
174 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-05-28
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Cold Creek Storage 2 is a 174 MW Solar+Battery project in Texas, currently active.

Cold Creek Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-05-28.

Queue ID
ERCOT-26INR0291
Location
Schleicher, Texas
Technology
Solar+Battery
Developer
Cold Creek Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)

What stands out

1

Cold Creek Storage 2 is a 174 MW Solar+Battery project in Texas with status active.

2

Cold Creek Solar LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-05-28.

Market and operating context

Queue date
2023-12-04
Proposed COD
2028-05-28
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cold Creek Storage 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0291
LocationSchleicher, Texas
TechnologySolar+Battery
DeveloperCold Creek Solar LLC
Market / regionERCOT
Point of interconnectionTap 345kV line Big Hill (#76003) - Twin Buttes (#76009)
Queue date2023-12-04
Proposed COD2028-05-28