Briefing/plantUnder construction
Cold Creek Solar Park is a 100 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Under construction.
Cold Creek Solar Park is reported in Michigan under DTE Energy. Available operating and financial measures include $1606/kW reported CapEx.
- Location
- Branch, Michigan
- Technology
- Solar Photovoltaic
- Owner / parent
- DTE Energy
- Operator
- DTE Electric Company
- Grid
- MISO (Midcontinent)
- Plant ID
- 69471
What stands out
1
Cold Creek Solar Park is a 100 MW Solar Photovoltaic asset in Michigan with status Under construction.
2
Available financial measures include $1606/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- State rank
- #31 of 101
- National rank
- #812 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.