Cold Creek Solar 2 is a 445 MW Solar+Battery project in Texas, currently active.
Cold Creek Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-05-28.
- Queue ID
- ERCOT-26INR0290
- Location
- Schleicher, Texas
- Technology
- Solar+Battery
- Developer
- Cold Creek Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)
What stands out
Cold Creek Solar 2 is a 445 MW Solar+Battery project in Texas with status active.
Cold Creek Solar LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-05-28.
Latest linked story: “A coal power plant in Texas, America’s newest, set to stay idle until 2027” (Straight Arrow News - SAN, 2025-10-14).
Market and operating context
- Queue date
- 2023-12-18
- Proposed COD
- 2028-05-28
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.