Coffee Creek BESS is a 17 MW Batteries asset in Oregon, currently Operating.
Coffee Creek BESS is reported in Oregon since 2024 under Portland General Electric. Available operating and financial measures include -0.0% capacity factor and -0 GWh annual generation; $1361/kW reported CapEx.
- Location
- Washington, Oregon
- Technology
- Batteries
- Owner / parent
- Portland General Electric
- Operator
- Portland General Electric Co
- Grid
- Portland General Electric Company
- Plant ID
- 67698
What stands out
Coffee Creek BESS is a 17 MW Batteries asset in Oregon with status Operating.
Latest annual operating measures report -0.0% capacity factor and -0 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Portland General Electric finalises agreements for 1GW renewables and BESS” (PV Tech, 2026-03-09).
Market and operating context
- Balancing authority
- Portland General Electric Company
- NERC region
- WECC
- State rank
- #9 of 10
- National rank
- #554 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.