Query
Cobble Mountain
Type
Entity Briefing
Entity
Cobble Mountain
State
MT
Generated
2026-10-18T07:14:34.116Z

Briefing on Cobble Mountain

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
33 MW
Capacity
Operating
Current status
1930
Operating since
3
Generators
2.7%
Capacity factor
8 GWh
Annual generation
Briefing/plantOperating

Cobble Mountain is a 33 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Cobble Mountain is reported in Massachusetts since 1930 under City of Holyoke Gas and Elec Dept - (MA). Available operating and financial measures include 2.7% capacity factor and 8 GWh annual generation; $2294/kW reported CapEx.

Location
Hampden, Massachusetts
Technology
Conventional Hydroelectric
Owner / parent
City of Holyoke Gas and Elec Dept - (MA)
Operator
City of Holyoke Gas and Elec Dept - (MA)
Grid
ISO New England
Plant ID
1630

What stands out

1

Cobble Mountain is a 33 MW Conventional Hydroelectric asset in Massachusetts with status Operating.

2

Latest annual operating measures report 2.7% capacity factor and 8 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Why Blandford residents are leery of a proposed battery storage site” (MassLive.com, 2025-09-25).

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#5 of 32
National rank
#384 of 1,462

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.