Briefing/projectactive
COBALT is a 513 MW Solar+Battery project in California, currently active.
The reported queue phase is C13. Proposed COD is 2027-05-31.
- Queue ID
- CAISO-1757
- Location
- Riverside, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Colorado River Substation 220kV
What stands out
1
COBALT is a 513 MW Solar+Battery project in California with status active.
2
The reported queue phase is C13; proposed COD is 2027-05-31.
3
Latest linked story: “Finance and construction updates from 2 GWh of US batteries” (ESS News, 2025-04-25).
Market and operating context
- Queue date
- 2020-04-15
- Proposed COD
- 2027-05-31
- IA status
- IA Executed
- Study phase
- C13
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.