Clyde Peaking Engine is a 10 MW Natural Gas Internal Combustion Engine asset in PJM Interconnection, currently Operating.
Clyde Peaking Engine is reported in Ohio since 2020 under Onsite Partners, LLC. Available operating and financial measures include 0.7% capacity factor and 1 GWh annual generation; $1116/kW reported CapEx.
- Location
- Sandusky, Ohio
- Technology
- Natural Gas Internal Combustion Engine
- Owner / parent
- Onsite Partners, LLC
- Operator
- Onsite Partners, LLC
- Grid
- PJM Interconnection
- Plant ID
- 64157
What stands out
Clyde Peaking Engine is a 10 MW Natural Gas Internal Combustion Engine asset in Ohio with status Operating.
Latest annual operating measures report 0.7% capacity factor and 1 GWh annual generation.
Available financial measures include $1116/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #40 of 46
- National rank
- #1504 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.