Query
Cloverdale Solar I
Type
Entity Briefing
Entity
Cloverdale Solar I
Generated
2026-10-19T14:17:27.831Z

Briefing on Cloverdale Solar I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2014
Operating since
1
Generators
16.7%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Cloverdale Solar I is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Cloverdale Solar I is reported in California since 2014 under Altus Power America Management, LLC. Available operating and financial measures include 16.7% capacity factor and 2 GWh annual generation; $25.1/MWh reported energy value.

Location
Sonoma, California
Technology
Solar Photovoltaic
Owner / parent
Altus Power America Management, LLC
Operator
Altus Power America Management, LLC
Grid
CAISO (California)
Plant ID
58949

What stands out

1

Cloverdale Solar I is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 16.7% capacity factor and 2 GWh annual generation.

3

Available financial measures include $25.1/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#704 of 992
National rank
#6721 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.