Clearwater Wind II is a 103 MW Onshore Wind Turbine asset in Montana, currently Operating.
Clearwater Wind II is reported in Montana since 2023 under NextEra Energy. Available operating and financial measures include 44.5% capacity factor and 401 GWh annual generation; $2114/kW reported CapEx.
- Location
- Rosebud, Montana
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Clearwater Wind II, LLC
- Grid
- NorthWestern Energy (NWMT)
- Plant ID
- 66184
What stands out
Clearwater Wind II is a 103 MW Onshore Wind Turbine asset in Montana with status Operating.
Latest annual operating measures report 44.5% capacity factor and 401 GWh annual generation.
Available financial measures include $2114/kW CapEx.
Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).
Market and operating context
- Balancing authority
- NorthWestern Energy (NWMT)
- NERC region
- WECC
- State rank
- #10 of 25
- National rank
- #697 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.