Query
Clearwater Wind East
Type
Entity Briefing
Entity
Clearwater Wind East
Technology
wind
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Clearwater Wind East

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

208 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
45.6%
Capacity factor
830 GWh
Annual generation
Briefing/plantOperating

Clearwater Wind East is a 208 MW Onshore Wind Turbine asset in Montana, currently Operating.

Clearwater Wind East is reported in Montana since 2024 under NextEra Energy. Available operating and financial measures include 45.6% capacity factor and 830 GWh annual generation; $2114/kW reported CapEx.

Location
Custer, Montana
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
Portland General Electric Co
Grid
NorthWestern Energy (NWMT)
Plant ID
66183

What stands out

1

Clearwater Wind East is a 208 MW Onshore Wind Turbine asset in Montana with status Operating.

2

Latest annual operating measures report 45.6% capacity factor and 830 GWh annual generation.

3

Available financial measures include $2114/kW CapEx.

4

Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).

Market and operating context

Balancing authority
NorthWestern Energy (NWMT)
NERC region
WECC
State rank
#5 of 25
National rank
#256 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.