Clearwater Wind East is a 208 MW Onshore Wind Turbine asset in Montana, currently Operating.
Clearwater Wind East is reported in Montana since 2024 under NextEra Energy. Available operating and financial measures include 45.6% capacity factor and 830 GWh annual generation; $2114/kW reported CapEx.
- Location
- Custer, Montana
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Portland General Electric Co
- Grid
- NorthWestern Energy (NWMT)
- Plant ID
- 66183
What stands out
Clearwater Wind East is a 208 MW Onshore Wind Turbine asset in Montana with status Operating.
Latest annual operating measures report 45.6% capacity factor and 830 GWh annual generation.
Available financial measures include $2114/kW CapEx.
Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).
Market and operating context
- Balancing authority
- NorthWestern Energy (NWMT)
- NERC region
- WECC
- State rank
- #5 of 25
- National rank
- #256 of 1,442
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.