Query
Clearwater 2
Type
Entity Briefing
Entity
Clearwater 2
Generated
2026-10-11T11:25:14.594Z

Briefing on Clearwater 2

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
26 MW
Capacity
Operating
Current status
1953
Operating since
1
Generators
15.2%
Capacity factor
35 GWh
Annual generation
Briefing/plantOperating

Clearwater 2 is a 26 MW Conventional Hydroelectric asset in Oregon, currently Operating.

Clearwater 2 is reported in Oregon since 1953 under Berkshire Hathaway. Available operating and financial measures include 15.2% capacity factor and 35 GWh annual generation.

Location
Douglas, Oregon
Technology
Conventional Hydroelectric
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - West
Plant ID
3021

What stands out

1

Clearwater 2 is a 26 MW Conventional Hydroelectric asset in Oregon with status Operating.

2

Latest annual operating measures report 15.2% capacity factor and 35 GWh annual generation.

Market and operating context

Balancing authority
PacifiCorp - West
NERC region
WECC
State rank
#23 of 63
National rank
#432 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.