Briefing/plantOut of service
Clear Lake Hydro Project is a 3 MW Conventional Hydroelectric asset in CAISO (California), currently Out of service.
Clear Lake Hydro Project is reported in California since 1985 under Yolo County Flood Control WCD. Available operating and financial measures include $2294/kW reported CapEx.
- Location
- Lake, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Yolo County Flood Control WCD
- Operator
- Yolo County Flood Control WCD
- Grid
- CAISO (California)
- Plant ID
- 50128
What stands out
1
Clear Lake Hydro Project is a 3 MW Conventional Hydroelectric asset in California with status Out of service.
2
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #211 of 247
- National rank
- #1138 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.