Query
Clayville
Type
Entity Briefing
Entity
Clayville
Generated
2026-10-17T12:11:12.466Z

Briefing on Clayville

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
73 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
9.7%
Capacity factor
62 GWh
Annual generation
Briefing/plantOperating

Clayville is a 73 MW Natural Gas Fired Combustion Turbine asset in PJM Interconnection, currently Operating.

Clayville is reported in New Jersey since 2015 under City of Vineland - (NJ). Available operating and financial measures include 9.7% capacity factor and 62 GWh annual generation; $812/kW reported CapEx.

Location
Cumberland, New Jersey
Technology
Natural Gas Fired Combustion Turbine
Owner / parent
City of Vineland - (NJ)
Operator
City of Vineland - (NJ)
Grid
PJM Interconnection
Plant ID
58235

What stands out

1

Clayville is a 73 MW Natural Gas Fired Combustion Turbine asset in New Jersey with status Operating.

2

Latest annual operating measures report 9.7% capacity factor and 62 GWh annual generation.

3

Available financial measures include $812/kW CapEx.

4

Latest linked story: “Vineland plan for electric plant upgrade to cost $2 million” (TheDailyJournal.com, 2019-03-29).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#23 of 49
National rank
#1049 of 2,025

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.