Clayville is a 73 MW Natural Gas Fired Combustion Turbine asset in PJM Interconnection, currently Operating.
Clayville is reported in New Jersey since 2015 under City of Vineland - (NJ). Available operating and financial measures include 9.7% capacity factor and 62 GWh annual generation; $812/kW reported CapEx.
- Location
- Cumberland, New Jersey
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- City of Vineland - (NJ)
- Operator
- City of Vineland - (NJ)
- Grid
- PJM Interconnection
- Plant ID
- 58235
What stands out
Clayville is a 73 MW Natural Gas Fired Combustion Turbine asset in New Jersey with status Operating.
Latest annual operating measures report 9.7% capacity factor and 62 GWh annual generation.
Available financial measures include $812/kW CapEx.
Latest linked story: “Vineland plan for electric plant upgrade to cost $2 million” (TheDailyJournal.com, 2019-03-29).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #23 of 49
- National rank
- #1049 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.