Clairton Works is a 31 MW Other Gases asset in PJM Interconnection, currently Operating.
Clairton Works is reported in Pennsylvania since 1955 under United States Steel- Clairton. Available operating and financial measures include 44.5% capacity factor and 121 GWh annual generation.
- Location
- Allegheny, Pennsylvania
- Technology
- Other Gases
- Owner / parent
- United States Steel- Clairton
- Operator
- United States Steel- Clairton
- Grid
- PJM Interconnection
- Plant ID
- 50729
What stands out
Clairton Works is a 31 MW Other Gases asset in Pennsylvania with status Operating.
Latest annual operating measures report 44.5% capacity factor and 121 GWh annual generation.
Latest linked story: “After deadly explosion, safety and environmental lapses at U.S. Steel’s coke works now rest with Nippon” (The Allegheny Front, 2026-03-09).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #1 of 1
- National rank
- #9 of 18
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.