Briefing on Clairemont Solar 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
252 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-02-13
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Clairemont Solar 1 is a 252 MW Solar project in Texas, currently active.

Clairemont Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-02-13.

Queue ID
ERCOT-27INR0435
Location
Kent, Texas
Technology
Solar
Developer
Clairemont Solar
Market / region
ERCOT
Point of interconnection
59908 Novaprime 345kV

What stands out

1

Clairemont Solar 1 is a 252 MW Solar project in Texas with status active.

2

Clairemont Solar is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2029-02-13.

Market and operating context

Queue date
2025-01-28
Proposed COD
2029-02-13
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Clairemont Solar 1 — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0435
LocationKent, Texas
TechnologySolar
DeveloperClairemont Solar
Market / regionERCOT
Point of interconnection59908 Novaprime 345kV
Queue date2025-01-28
Proposed COD2029-02-13