Query
City of Madera WWTP
Type
Entity Briefing
Entity
City of Madera WWTP
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on City of Madera WWTP

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2009
Operating since
1
Generators
16.2%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

City of Madera WWTP is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

City of Madera WWTP is reported in California since 2009 under SunE GIL1, LLC. Available operating and financial measures include 16.2% capacity factor and 1 GWh annual generation; $17.4/MWh reported energy value.

Location
Madera, California
Technology
Solar Photovoltaic
Owner / parent
SunE GIL1, LLC
Operator
SunE GIL1, LLC
Grid
CAISO (California)
Plant ID
57682

What stands out

1

City of Madera WWTP is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 16.2% capacity factor and 1 GWh annual generation.

3

Available financial measures include $17.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#949 of 992
National rank
#7518 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.