Briefing/projectsuspended
Circleville Solar Energy is a 70 MW Solar project in Ohio, currently suspended.
The reported queue phase is IA Executed. Proposed COD is 2027-12-31.
- Queue ID
- PJM-AC2-029
- Location
- Pickaway, Ohio
- Technology
- Solar
- Market / region
- PJM
- Point of interconnection
- Circleville 138kV
What stands out
1
Circleville Solar Energy is a 70 MW Solar project in Ohio with status suspended.
2
The reported queue phase is IA Executed; proposed COD is 2027-12-31.
3
Latest linked story: “Ohio Supreme Court to Decide Whether Local Opposition Can Block Circleville Solar Project” (Scioto Post, 2026-01-07).
Market and operating context
- Queue date
- 2017-02-02
- Proposed COD
- 2027-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.