Query
Circleville Solar Energy
Type
Entity Briefing
Entity
Circleville Solar Energy
Technology
solar
Generated
2026-10-13T10:58:34.855Z

Briefing on Circleville Solar Energy

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
70 MW
Proposed capacity
suspended
Current status
Solar
Technology
PJM
Market / region
2027-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectsuspended

Circleville Solar Energy is a 70 MW Solar project in Ohio, currently suspended.

The reported queue phase is IA Executed. Proposed COD is 2027-12-31.

Queue ID
PJM-AC2-029
Location
Pickaway, Ohio
Technology
Solar
Market / region
PJM
Point of interconnection
Circleville 138kV

What stands out

1

Circleville Solar Energy is a 70 MW Solar project in Ohio with status suspended.

2

The reported queue phase is IA Executed; proposed COD is 2027-12-31.

3

Latest linked story: “Ohio Supreme Court to Decide Whether Local Opposition Can Block Circleville Solar Project” (Scioto Post, 2026-01-07).

Market and operating context

Queue date
2017-02-02
Proposed COD
2027-12-31
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Circleville Solar Energy — verified asset snapshot

FieldValue
Queue IDPJM-AC2-029
LocationPickaway, Ohio
TechnologySolar
Market / regionPJM
Point of interconnectionCircleville 138kV
Queue date2017-02-02
Proposed COD2027-12-31
IA statusIA Executed