Query
Chula Vista Energy Center 2
Type
Entity Briefing
Entity
Chula Vista Energy Center 2
Generated
2026-10-18T01:00:52.157Z

Briefing on Chula Vista Energy Center 2

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
50 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Chula Vista Energy Center 2 is a 50 MW Batteries asset in CAISO (California), currently Under construction.

Chula Vista Energy Center 2 is reported in California under Wellhead Electric Company. Available operating and financial measures include $1361/kW reported CapEx.

Location
San Diego, California
Technology
Batteries
Owner / parent
Wellhead Electric Company
Operator
Wellhead Services, Inc
Grid
CAISO (California)
Plant ID
67878

What stands out

1

Chula Vista Energy Center 2 is a 50 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “San Diego Community Power OKs contract for battery storage project in Chula Vista” (San Diego Union-Tribune, 2024-01-26).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#100 of 202
National rank
#455 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Chula Vista Energy Center 2 — verified asset snapshot

FieldValue
LocationSan Diego, California
TechnologyBatteries
Owner / parentWellhead Electric Company
OperatorWellhead Services, Inc
GridCAISO (California)
Plant ID67878
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator