Briefing/projectactive
Chocolate Bayou BESS is a 10 MW Battery project in ERCOT, currently active.
Concurrent Holdco. , LLC. is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-05-01.
- Queue ID
- ERCOT-24INR0583
- Technology
- Battery
- Developer
- Concurrent Holdco. , LLC.
- Market / region
- ERCOT
- Point of interconnection
- Station Name: CHOCBAYU _x000D_ Load Name: 38_12_1. Node number 0701._x000D_ Bus #: 80064_x000D_ Voltage: 138 kV
What stands out
1
Chocolate Bayou BESS is a 10 MW Battery project with status active.
2
Concurrent Holdco. , LLC. is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2026-05-01.
Market and operating context
- Queue date
- 2023-08-22
- Proposed COD
- 2026-05-01
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.