Query
Chisme Solar
Type
Entity Briefing
Entity
Chisme Solar
Technology
solar
Generated
2026-10-19T11:22:06.479Z

Briefing on Chisme Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
147 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-04-13
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Chisme Solar is a 147 MW Solar+Battery project in Texas, currently active.

Blue Heron Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-13.

Queue ID
ERCOT-24INR0333
Location
Brown, Texas
Technology
Solar+Battery
Developer
Blue Heron Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH

What stands out

1

Chisme Solar is a 147 MW Solar+Battery project in Texas with status active.

2

Blue Heron Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-04-13.

Market and operating context

Queue date
2023-01-17
Proposed COD
2027-04-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Chisme Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0333
LocationBrown, Texas
TechnologySolar+Battery
DeveloperBlue Heron Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH
Queue date2023-01-17
Proposed COD2027-04-13