Briefing/projectactive
Chisme Solar is a 147 MW Solar+Battery project in Texas, currently active.
Blue Heron Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-13.
- Queue ID
- ERCOT-24INR0333
- Location
- Brown, Texas
- Technology
- Solar+Battery
- Developer
- Blue Heron Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH
What stands out
1
Chisme Solar is a 147 MW Solar+Battery project in Texas with status active.
2
Blue Heron Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-04-13.
Market and operating context
- Queue date
- 2023-01-17
- Proposed COD
- 2027-04-13
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.