Query
Chief Joseph
Type
Entity Briefing
Entity
Chief Joseph
Generated
2026-10-19T15:38:44.184Z

Briefing on Chief Joseph

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
2.5 GW
Capacity
Operating
Current status
1955
Operating since
27
Generators
45.5%
Capacity factor
9806 GWh
Annual generation
Briefing/plantOperating

Chief Joseph is a 2.5 GW Conventional Hydroelectric asset in Washington, currently Operating.

Chief Joseph is reported in Washington since 1955 under USACE Northwestern Division. Available operating and financial measures include 45.5% capacity factor and 9806 GWh annual generation; $2294/kW reported CapEx.

Location
Douglas, Washington
Technology
Conventional Hydroelectric
Owner / parent
USACE Northwestern Division
Operator
USACE Northwestern Division
Grid
Bonneville Power Administration
Plant ID
3921

What stands out

1

Chief Joseph is a 2.5 GW Conventional Hydroelectric asset in Washington with status Operating.

2

Latest annual operating measures report 45.5% capacity factor and 9806 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Chief Joseph dam powerhouse” (USACE Northwestern Division (.mil), 2025-08-13).

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#2 of 73
National rank
#3 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.