Query
Chickasaw Nation Solar Farm
Type
Entity Briefing
Entity
Chickasaw Nation Solar Farm
Technology
solar
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Chickasaw Nation Solar Farm

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

5 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
24.0%
Capacity factor
11 GWh
Annual generation
Briefing/plantOperating

Chickasaw Nation Solar Farm is a 5 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Operating.

Chickasaw Nation Solar Farm is reported in Oklahoma since 2020 under Oklahoma Gas & Electric Co. Available operating and financial measures include 24.0% capacity factor and 11 GWh annual generation; $41.8/MWh reported energy value.

Location
Murray, Oklahoma
Technology
Solar Photovoltaic
Owner / parent
Oklahoma Gas & Electric Co
Operator
Oklahoma Gas & Electric Co
Grid
SPP (Southwest Power Pool)
Plant ID
63500

What stands out

1

Chickasaw Nation Solar Farm is a 5 MW Solar Photovoltaic asset in Oklahoma with status Operating.

2

Latest annual operating measures report 24.0% capacity factor and 11 GWh annual generation.

3

Available financial measures include $41.8/MWh energy value.

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#17 of 25
National rank
#3096 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.