Chestnut is a 286 MW Batteries asset in CAISO (California), currently Operating.
Chestnut is reported in California since 2023 under Chestnut Westside LLC. Available operating and financial measures include 15.1% capacity factor and 378 GWh annual generation; $3.1/MWh reported energy value.
- Location
- Kings, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Chestnut Westside LLC
- Operator
- Chestnut Westside LLC
- Grid
- CAISO (California)
- Plant ID
- 63849
What stands out
Chestnut is a 286 MW Batteries asset in California with status Operating.
Latest annual operating measures report 15.1% capacity factor and 378 GWh annual generation.
Available financial measures include $3.1/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #35 of 992
- National rank
- #180 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.