Query
Chester Diversion Hydroelectric Project
Type
Entity Briefing
Entity
Chester Diversion Hydroelectric Project
Technology
hydro
Generated
2026-10-12T03:20:50.594Z

Briefing on Chester Diversion Hydroelectric Project

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
4 MW
Capacity
Operating
Current status
2014
Operating since
3
Generators
24.6%
Capacity factor
8 GWh
Annual generation
Briefing/plantOperating

Chester Diversion Hydroelectric Project is a 4 MW Conventional Hydroelectric asset in Idaho, currently Operating.

Chester Diversion Hydroelectric Project is reported in Idaho since 2014 under Fall River Rural Elec Coop Inc. Available operating and financial measures include 24.6% capacity factor and 8 GWh annual generation; $1221/kW reported CapEx.

Location
Fremont, Idaho
Technology
Conventional Hydroelectric
Owner / parent
Fall River Rural Elec Coop Inc
Operator
Fall River Rural Elec Coop Inc
Grid
Bonneville Power Administration
Plant ID
56893

What stands out

1

Chester Diversion Hydroelectric Project is a 4 MW Conventional Hydroelectric asset in Idaho with status Operating.

2

Latest annual operating measures report 24.6% capacity factor and 8 GWh annual generation.

3

Available financial measures include $1221/kW CapEx.

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#49 of 76
National rank
#1000 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.