Query
Cherry Sage Solar 1 SLF
Type
Entity Briefing
Entity
Cherry Sage Solar 1 SLF
Generated
2026-10-19T20:31:52.459Z

Briefing on Cherry Sage Solar 1 SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
143 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-02-23
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cherry Sage Solar 1 SLF is a 143 MW Solar+Battery project in Texas, currently active.

Cherry Sage Solar 1 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-23.

Queue ID
ERCOT-28INR0358
Location
Concho, Texas
Technology
Solar+Battery
Developer
Cherry Sage Solar 1 LLC
Market / region
ERCOT
Point of interconnection
(#60423) TREADWELL 138kV.

What stands out

1

Cherry Sage Solar 1 SLF is a 143 MW Solar+Battery project in Texas with status active.

2

Cherry Sage Solar 1 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-02-23.

Market and operating context

Queue date
2025-04-25
Proposed COD
2029-02-23
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cherry Sage Solar 1 SLF — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0358
LocationConcho, Texas
TechnologySolar+Battery
DeveloperCherry Sage Solar 1 LLC
Market / regionERCOT
Point of interconnection(#60423) TREADWELL 138kV.
Queue date2025-04-25
Proposed COD2029-02-23