Query
Chaves County Solar II
Type
Entity Briefing
Entity
Chaves County Solar II
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Chaves County Solar II

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

30 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
26.9%
Capacity factor
71 GWh
Annual generation
Briefing/plantOperating

Chaves County Solar II is a 30 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Operating.

Chaves County Solar II is reported in New Mexico since 2023 under NextEra Energy. Available operating and financial measures include 26.9% capacity factor and 71 GWh annual generation.

Location
Chaves, New Mexico
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Chaves County Solar II, LLC
Grid
SPP (Southwest Power Pool)
Plant ID
66405

What stands out

1

Chaves County Solar II is a 30 MW Solar Photovoltaic asset in New Mexico with status Operating.

2

Latest annual operating measures report 26.9% capacity factor and 71 GWh annual generation.

3

Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
WECC
State rank
#29 of 122
National rank
#1586 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.