Charles P Keller is a 29 MW Natural Gas Internal Combustion Engine asset in NYISO (New York), currently Operating.
Charles P Keller is reported in New York since 1954 under Village of Rockville Centre - (NY). Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $965/kW reported CapEx.
- Location
- Nassau, New York
- Technology
- Natural Gas Internal Combustion Engine
- Owner / parent
- Village of Rockville Centre - (NY)
- Operator
- Village of Rockville Centre - (NY)
- Grid
- NYISO (New York)
- Plant ID
- 2695
What stands out
Charles P Keller is a 29 MW Natural Gas Internal Combustion Engine asset in New York with status Operating.
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #67 of 103
- National rank
- #1279 of 2,025
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.