Query
Chanute Solar
Type
Entity Briefing
Entity
Chanute Solar
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Chanute Solar

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

6 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Chanute Solar is a 6 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Under construction.

Chanute Solar is reported in Kansas under Evergy. Available operating and financial measures include $1606/kW reported CapEx.

Location
Neosho, Kansas
Technology
Solar Photovoltaic
Owner / parent
Evergy
Operator
Evergy Kansas Central, Inc
Grid
SPP (Southwest Power Pool)
Plant ID
69036

What stands out

1

Chanute Solar is a 6 MW Solar Photovoltaic asset in Kansas with status Under construction.

2

Available financial measures include $1606/kW CapEx.

3

Latest linked story: “Evergy's green energy plan fuels debate in Kansas, Missouri” (KMBC, 2021-06-14).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#7 of 41
National rank
#2505 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Chanute Solar — verified asset snapshot

FieldValue
LocationNeosho, Kansas
TechnologySolar Photovoltaic
Owner / parentEvergy
OperatorEvergy Kansas Central, Inc
GridSPP (Southwest Power Pool)
Plant ID69036
ISO / marketSPP (Southwest Power Pool)
Balancing authoritySouthwest Power Pool