Chace Mill Winooski One is a 8 MW Conventional Hydroelectric asset in ISO New England, currently Operating.
Chace Mill Winooski One is reported in Vermont since 1993 under City of Burlington Electric - (VT). Available operating and financial measures include 44.7% capacity factor and 29 GWh annual generation; $2294/kW reported CapEx.
- Location
- Chittenden, Vermont
- Technology
- Conventional Hydroelectric
- Owner / parent
- City of Burlington Electric - (VT)
- Operator
- City of Burlington Electric - (VT)
- Grid
- ISO New England
- Plant ID
- 54355
What stands out
Chace Mill Winooski One is a 8 MW Conventional Hydroelectric asset in Vermont with status Operating.
Latest annual operating measures report 44.7% capacity factor and 29 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #9 of 45
- National rank
- #754 of 1,462
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.