Centralia Battery Energy Storage System is a 200 MW Batteries asset in Washington, currently Planned.
Centralia Battery Energy Storage System is reported in Washington under CENT bn, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Thurston, Washington
- Technology
- Batteries
- Owner / parent
- CENT bn, LLC
- Operator
- CENT bn, LLC
- Grid
- Puget Sound Energy
- Plant ID
- 68282
What stands out
Centralia Battery Energy Storage System is a 200 MW Batteries asset in Washington with status Planned.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Examiner OKs controversial energy facility in Thurston Co. Here’s what to know” (The Olympian, 2026-03-19).
Market and operating context
- Balancing authority
- Puget Sound Energy
- NERC region
- WECC
- State rank
- #4 of 8
- National rank
- #210 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.