Query
Central Power Station
Type
Entity Briefing
Entity
Central Power Station
Generated
2026-10-19T17:16:17.463Z

Briefing on Central Power Station

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
750 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2027-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Central Power Station is a 750 MW Gas project in Texas, currently active.

Hydra-Gen Energy Unlimited is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.

Queue ID
ERCOT-26INR0370
Location
Grimes, Texas
Technology
Gas
Developer
Hydra-Gen Energy Unlimited
Market / region
ERCOT
Point of interconnection
967 Gibbons Creek 345kV

What stands out

1

Central Power Station is a 750 MW Gas project in Texas with status active.

2

Hydra-Gen Energy Unlimited is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-01.

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Central Power Station — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0370
LocationGrimes, Texas
TechnologyGas
DeveloperHydra-Gen Energy Unlimited
Market / regionERCOT
Point of interconnection967 Gibbons Creek 345kV
Queue date2024-03-22
Proposed COD2027-05-01