Centennial Solar
Type
Entity Briefing
Entity
Centennial Solar
Generated
2026-10-19T13:49:19.793Z

Briefing on Centennial Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
61 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-04-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Centennial Solar is a 61 MW Solar project in Texas, currently active.

Centennial AD 8 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-30.

Queue ID
ERCOT-26INR0372
Location
Menard, Texas
Technology
Solar
Developer
Centennial AD 8 LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 6364 YELLOW JACKET - 76390 FORT MASON

What stands out

1

Centennial Solar is a 61 MW Solar project in Texas with status active.

2

Centennial AD 8 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-30.

4

Latest linked story: “Woolly ‘Lambscapers’ Back at Alamo 2 Solar Farm” (San Antonio Report, 2015-05-13).

Market and operating context

Queue date
2024-01-03
Proposed COD
2029-04-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Centennial Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0372
LocationMenard, Texas
TechnologySolar
DeveloperCentennial AD 8 LLC
Market / regionERCOT
Point of interconnectionTap 138kV 6364 YELLOW JACKET - 76390 FORT MASON
Queue date2024-01-03
Proposed COD2029-04-30