Cenergy - Kiger is a 1 MW Solar Photovoltaic asset in ISO New England, currently Operating.
Cenergy - Kiger is reported in Maine since 2023 under Luminace Sunbeam Development Holdings, LLC. Available operating and financial measures include 22.4% capacity factor and 2 GWh annual generation; $30.7/MWh reported energy value.
- Location
- Somerset, Maine
- Technology
- Solar Photovoltaic
- Owner / parent
- Luminace Sunbeam Development Holdings, LLC
- Operator
- Luminace Sunbeam Development Holdings, LLC
- Grid
- ISO New England
- Plant ID
- 66877
What stands out
Cenergy - Kiger is a 1 MW Solar Photovoltaic asset in Maine with status Operating.
Latest annual operating measures report 22.4% capacity factor and 2 GWh annual generation.
Available financial measures include $30.7/MWh energy value.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #158 of 165
- National rank
- #7805 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.