Query
Cedar Trail
Type
Entity Briefing
Entity
Cedar Trail
Generated
2026-10-09T08:37:56.192Z

Briefing on Cedar Trail

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
75 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
27.3%
Capacity factor
178 GWh
Annual generation
Briefing/plantOperating

Cedar Trail is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.

Cedar Trail is reported in Florida since 2024 under NextEra Energy. Available operating and financial measures include 27.3% capacity factor and 178 GWh annual generation; $1446/kW reported CapEx.

Location
Baker, Florida
Technology
Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Florida Power & Light Co
Grid
Florida Power & Light Company
Plant ID
67672

What stands out

1

Cedar Trail is a 75 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 27.3% capacity factor and 178 GWh annual generation.

3

Available financial measures include $1446/kW CapEx.

4

Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#119 of 237
National rank
#1124 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.