Cedar Trail is a 75 MW Solar Photovoltaic asset in Florida, currently Operating.
Cedar Trail is reported in Florida since 2024 under NextEra Energy. Available operating and financial measures include 27.3% capacity factor and 178 GWh annual generation; $1446/kW reported CapEx.
- Location
- Baker, Florida
- Technology
- Solar Photovoltaic
- Owner / parent
- NextEra Energy
- Operator
- Florida Power & Light Co
- Grid
- Florida Power & Light Company
- Plant ID
- 67672
What stands out
Cedar Trail is a 75 MW Solar Photovoltaic asset in Florida with status Operating.
Latest annual operating measures report 27.3% capacity factor and 178 GWh annual generation.
Available financial measures include $1446/kW CapEx.
Latest linked story: “NextEra Energy to Acquire Dominion, Creating a Utility Giant” (The New York Times, 2026-05-17).
Market and operating context
- Balancing authority
- Florida Power & Light Company
- NERC region
- SERC
- State rank
- #119 of 237
- National rank
- #1124 of 7,971
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.