Query
Cedar Springs II
Type
Entity Briefing
Entity
Cedar Springs II
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Cedar Springs II

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

200 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
37.2%
Capacity factor
652 GWh
Annual generation
Briefing/plantOperating

Cedar Springs II is a 200 MW Onshore Wind Turbine asset in Wyoming, currently Operating.

Cedar Springs II is reported in Wyoming since 2020 under Berkshire Hathaway. Available operating and financial measures include 37.2% capacity factor and 652 GWh annual generation.

Location
Converse, Wyoming
Technology
Onshore Wind Turbine
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - East
Plant ID
63915

What stands out

1

Cedar Springs II is a 200 MW Onshore Wind Turbine asset in Wyoming with status Operating.

2

Latest annual operating measures report 37.2% capacity factor and 652 GWh annual generation.

3

Latest linked story: “Utahns deserve lower bills, not higher profits for PacifiCorp” (Utah News Dispatch, 2025-10-28).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#10 of 31
National rank
#361 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.