68 MW
Capacity
Operating
Current status
2008
Operating since
1
Generators
29.4%
Capacity factor
175 GWh
Annual generation
Briefing/plantOperating

Cedar Ridge is a 68 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Cedar Ridge is reported in Wisconsin since 2008 under Alliant Energy. Available operating and financial measures include 29.4% capacity factor and 175 GWh annual generation; $2320/kW reported CapEx.

Location
Fond Du Lac, Wisconsin
Technology
Onshore Wind Turbine
Owner / parent
Alliant Energy
Operator
Wisconsin Power & Light Co
Grid
MISO (Midcontinent)
Plant ID
56347

What stands out

1

Cedar Ridge is a 68 MW Onshore Wind Turbine asset in Wisconsin with status Operating.

2

Latest annual operating measures report 29.4% capacity factor and 175 GWh annual generation.

3

Available financial measures include $11.9/MWh OpEx, $2320/kW CapEx.

4

Latest linked story: “Alliant Energy utility wants to demonstrate nation’s first CO2-based long-duration ‘energy dome’” (Utility Dive, 2024-08-20).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#6 of 13
National rank
#879 of 1,442

Why it matters