Briefing/plantOperating
Cedar Hills is a 5 MW Landfill Gas asset in Washington, currently Operating.
Cedar Hills is reported in Washington since 2009 under King County Solid Waste Division. Available operating and financial measures include 0.2% capacity factor and 0 GWh annual generation; $765/kW reported CapEx.
- Location
- King, Washington
- Technology
- Landfill Gas
- Owner / parent
- King County Solid Waste Division
- Operator
- King County Solid Waste Division
- Grid
- Puget Sound Energy
- Plant ID
- 57298
What stands out
1
Cedar Hills is a 5 MW Landfill Gas asset in Washington with status Operating.
2
Latest annual operating measures report 0.2% capacity factor and 0 GWh annual generation.
3
Available financial measures include $765/kW CapEx.
Market and operating context
- Balancing authority
- Puget Sound Energy
- NERC region
- WECC
- State rank
- #1 of 2
- National rank
- #99 of 282
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.