Briefing on Cedar Draw Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
451 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cedar Draw Solar is a 451 MW Solar+Battery project in Texas, currently active.

Cedar Draw Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.

Queue ID
ERCOT-27INR0192
Location
Scurry, Texas
Technology
Solar+Battery
Developer
Cedar Draw Solar LLC
Market / region
ERCOT
Point of interconnection
60011 Nebula7A 345kV

What stands out

1

Cedar Draw Solar is a 451 MW Solar+Battery project in Texas with status active.

2

Cedar Draw Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-31.

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cedar Draw Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0192
LocationScurry, Texas
TechnologySolar+Battery
DeveloperCedar Draw Solar LLC
Market / regionERCOT
Point of interconnection60011 Nebula7A 345kV
Queue date2024-03-22
Proposed COD2027-12-31